...

Join us as we briefly walk the job site and point out where the new shop will be going, why we are staying offset from the power line, how we will use the material for structural fill and get new gravel. we talked about drainage and a few other things that we consider when going through the pre-construction phase of our build process.

Notice how we used White Flags and White spray paint to Mark out the location at the shop? This is the color you use so the locators and others do not mistake it with a actual utility or other service.

Leave a Reply

Your email address will not be published. Required fields are marked *

Seraphinite AcceleratorOptimized by Seraphinite Accelerator
Turns on site high speed to be attractive for people and search engines.